
Plus de photos: Photo 1, Photo 2, Photo 3, Photo 4, Photo 5, Photo 6, Photo 7, Photo 8, Photo 9. | ||
1. CONSTRUCTION Steel hull and Aluminium superstructure with teak laid decks
2. MAIN CHARACTERISTICS
General BUILDER: Feadship YEAR: 1999 LOA: 47.55m/156' 0" BEAM: 8.84m/29' 2" DRAFT: 3.2m/10' 6" GROSS TONS: 552 Tons DESIGNER: De Voogt Naval Architects NAVAL ARCHITECT: De Voogt HULL COLOUR: Blue
Capacities CRUISE SPEED: 12 Knots (approx) MAXIMUM SPEED: 14 Knots (approx) RANGE: 4500 nm (approx) at 11 Knots including one generator. FUEL CAPACITY: 67,750 Litres (17,897 US Gallons) WATER CAPACITY: 21,570 Litres (5,698 US Gallons) FUEL CONSUMPTION: 180lt/ph at 11 Knots approx
3. MACHINERY
ENGINES: 2 x CAT 905HP ENGINE MODEL: 3508B DITA 675Kw ENGINE HOURS: Port: 11,186hrs - Starboard: 11,175hrs (14-Oct-2010) FUEL: DIESEL PROPULSION: PROP SHAFT GEARBOXES: Reintjes WAF 541 / 3.955:1 ratio STEERING: Tenfjord 5 Bladed Propellors STABILIZERS: Zero speed stabilisers (Quantum fins + Power pack with Vosper heads)
Generators GENERATORS: Two x CAT 3304 100kw at 1800rpm GENERATOR HOURS: Port: 1080 - Stbd: 1130 Both generators overhauled at 12,000hrs (April 2010)
Electricity ELECTRICITY: 208V 3phase 60hz Atlas frequency converter SHORE POWER: 208V 3phase 60hz shore and ship power
Air Conditioning N.R. Koeling chilled-water system
Other Machinery Two x HEM watermakers each producing 8,000 liters per day Jastream BU 2886 75kw bowthruster Alfa Laval fuel treatment system with Separ secondary filters
4. ACCOMMODATION
Guest accommodation: sleeping for up to twelve guests in six ensuite cabins: Full beam Master cabin on main deck forward with his and hers ensuite bathrooms (one Jaccuzzi bath and one shower) Full beam VIP guest cabin on lower deck (forward of the engine room) with ensuite bathroom. Four twin guest cabins on lower deck aft, two with ensuite bathrooms and two with ensuite showers.
Crew accommodation: sleeping for up to ten in five cabins, all with individual shower rooms. One Captains cabin on the bridge deck port side and aft of the wheelhouse. Four twin cabins on the lower deck forward.
5. GALLEY & LAUNDRY EQUIPMENT
6. COMMUNICATIONS, NAVIGATION & ENTERTAINMENT EQUIPMENT
Communications Equipment
Navigation Equipment
Entertainment Equipment
7. TENDERS & WATERSPORTS EQUIPMENT
8. DECK EQUIPMENT
9. SAFETY & SECURITY EQUIPMENT
10. REFIT HISTORY
Installation of zero speed stabilizers in 2006 Hull paint to bare metal in 2006 (Pinmar MB92) New Propellers in 2007 (two spare) Gantries and gangway serviced with new cables in 2009
2010 (April) Refit: Both generators zero houred/ overhauled Galley and Laundry refurbishement and replacement of all appliances New fabrics throughout the interior (all carpets, head lining, head boards, deck heads) New sofas and chairs in both salons All batteries (service and engines) replaced with new ones
11. COMMENTS This superb 47.55 meter six cabin Feadship was built in 1999 at the Van Lent yard.
12. EXCLUSIONS
A complete list of exclusions is available upon request. | ||
Contact Alex Lees-Buckley at +377 979 77 700 or email him at alb@mon.cnyachts.com | ||
Please contact Alex Lees-Buckley at +377 979 77 700 | ||
Contact Camper & Nicholsons International.
|
2011
Benetti
Unknown
2014
Wider
150
2010
Benetti
Unknown
2001
Perini Navi
Unknown
2003
Jongert
Unknown
1981
Campanella
Unknown